To achieve our vision of a high quality, sustainable urban design environment, Doncaster Hill has a number of unique processes in place - in addition to the Manningham Planning Scheme provisions.

These tools are designed to help you navigate more efficiently through the planning permit application process when developing in Doncaster Hill.
 


View requirements for water initiatives

Every planning permit issued within Doncaster Hill will include conditions for the submission of a Sustainability Management Plan (SMP) which achieves best practice outcomes. The SMP addresses a range of matters including water, energy and indoor environment quality. With respect to water, it is a permit condition that the development must connect to Yarra Water’s recycled water and meet our stormwater objectives.


Plumbing guidelines for Doncaster Hill

Guidelines have been produced in partnership with Victorian Water Retailers to assist developers and plumbers installing compliant pipework to meet Water Authority connection requirements and to address planning conditions that meet our sustainability and stormwaters requirements.

Icon for application/pdf View guidelines for recycled water and rainwater in medium to high density developments (September 2018) (1.34 MB)

More specifically:

Icon for application/pdf Guidelines for developers (429.08 KB)

Icon for application/pdf Guidelines for consultants/architects (1.1 MB)

Icon for application/pdf Guidelines for plumbers (2.12 MB)


Download the development contributions levy

A Development Contribution Plan (DCP) is a mechanism used to levy new development for financial contributions to planned community infrastructure, such as libraries, pedestrian and cycling paths, streetscape improvements and public art.

Download Icon for application/pdf Doncaster Hill Development Contributions Plan (February 2005) (5.14 MB)

Download Icon for application/pdf Development Contribution Plan levies payable July 2020 to June 2021 (133.87 KB)


Construction specifications for the boulevard

Find out about the boulevard construction specifications for developments located along Doncaster, Williamsons and Tram Roads (including the ceding of land to Council).

Learn more 


Submit a Construction Management Plan *new 2020 template*

Find out about how we manage the protection of neighbourhood amenity and assets during construction

Submit a Construction Management Plan


Supply 3D building models for visualisations

For all new major developments planned within Doncaster Hill, you are now required to supply a 3D building file of the proposed development.

Learn more


Download the current development status report

Doncaster Hill has undergone significant transformation since the Doncaster Hill Strategy was introduced in 2004 with a number of completed developments, under construction or review.

Download Icon for application/pdf Doncaster Hill development map update November 2019 (4.46 MB)

 